Photo by Imran Sokwala @ISokwala
Every Kenyan motorist knows the frustration: you leave home for your usual commute, only to find that a major road has been dug up overnight. No warning signs appeared the day before. No alternative route was suggested. The four-lane highway you relied on has suddenly become a single dirt track, and what should have been a 30-minute journey has ballooned into two hours of bumper-to-bumper chaos.
This isn't an occasional inconvenience. It's become part of the accepted rhythm of Kenyan urban life, particularly in Nairobi, Mombasa, Kisumu, and other growing cities. But should it be? And more importantly, what is this acceptance really costing us?
The Pattern: Disruption Without Direction
The typical Kenyan road construction project follows a predictable yet frustrating pattern. A major route like Thika Road, Mombasa Road, or Waiyaki Way gets earmarked for upgrades or repairs. This should be good news, infrastructure development driving economic growth and all that. But then the execution begins, and the problems multiply.
Entire lanes disappear without warning. Four lanes become two, then one, sometimes overnight. Neighborhoods that once had multiple access points suddenly find themselves funneled through a single narrow bottleneck. Major junctions that handled thousands of vehicles per hour are reduced to dirt tracks barely wide enough for two cars to pass.
During peak morning and evening hours, when traffic is already at its worst, construction work often grinds to a halt. Workers take breaks, machinery sits idle, and thousands of motorists inch forward through construction zones that aren't even being actively worked on. The congestion that results isn't just an annoyance, it's a massive drain on Kenya's economy and the wellbeing of its people.
The Real Cost of Poor Planning
When we talk about the cost of road construction chaos, most people think about the inconvenience. The extra hour in traffic. The frustration of being late to work or missing a meeting. But the actual economic impact goes far deeper.
Fuel Wastage
Consider the fuel costs alone. A vehicle idling in traffic consumes approximately 0.6 to 1.0 liters of fuel per hour. If 100,000 vehicles are stuck in construction-related congestion for just one extra hour per day, that's 60,000 to 100,000 liters of fuel wasted daily. At current fuel prices of around Ksh 180 per liter, that's up to Ksh 18 million per day, or over Ksh 6 billion per year, just in one city, just from one poorly planned project.
Vehicle Wear and Tear
The constant stop-and-go traffic accelerates wear on brakes, clutches, and engines. Navigating poorly maintained diversions filled with potholes damages suspensions and tires. Many Kenyan motorists find themselves visiting mechanics far more frequently during major construction projects, adding hundreds of thousands of shillings in unexpected maintenance costs.
Lost Productivity
Time is money, and nowhere is this truer than in traffic. Business owners miss meetings. Employees arrive at work exhausted before their day has even begun. Delivery trucks take twice as long to complete their routes, increasing operational costs that eventually get passed to consumers. The Kenya Institute for Public Policy Research and Analysis has estimated that traffic congestion costs Nairobi alone over Ksh 50 million per day in lost productivity, a figure that spikes dramatically during major construction projects.
Mental Health Impact
There's also a less quantifiable but equally important cost: the psychological toll. Sitting in traffic for hours, dealing with uncertainty about how long your journey will take, the constant low-level stress of navigating chaotic construction zones, all of this takes a cumulative toll on mental health and quality of life.
Why Does It Have to Be This Way?
The frustrating answer is: it doesn't. Many countries face similar infrastructure challenges but manage construction with far less disruption. The difference lies in planning, communication, and accountability.
The Communication Gap
One of the most basic failures in Kenyan road construction is communication. Projects begin without adequate public notice. Even when notices are issued, they're often vague, lack specific timelines, and don't provide clear information about alternative routes.
The Kenya National Highways Authority (KeNHA), Kenya Urban Roads Authority (KURA), and county governments maintain websites and social media accounts, but these are rarely updated with real-time, detailed information about ongoing projects. Motorists are left to discover disruptions themselves, often when they're already stuck in them.
Lack of Phased Construction
International best practices call for phased construction on major routes. This means working on one section at a time while keeping other lanes open, or scheduling work during off-peak hours to minimize disruption. In Kenya, it's common to see entire stretches of road torn up simultaneously, with no viable alternative routes planned or prepared.
The dualling of Ngong Road, for instance, saw massive sections closed without adequate preparation of alternative routes, creating gridlock across multiple neighborhoods. Similar patterns have played out on virtually every major urban road project in recent years.
Inadequate Diversions
When diversions are created, they're often afterthoughts rather than integral parts of the project plan. Narrow dirt tracks that become impassable during rain. Routes through residential areas never designed for heavy traffic. Diversions that add 10 or 15 kilometers to a journey that should be 3 kilometers.
Proper diversion planning would involve upgrading alternative routes before the main road is closed, ensuring they can handle the diverted traffic load. This rarely happens in Kenya.
Work Scheduling Issues
Perhaps nothing frustrates motorists more than seeing construction zones completely idle during peak traffic hours. If work must be done on major routes, why not schedule the most disruptive activities for nights and weekends when traffic volumes are lower?
Some will argue this increases costs due to overtime and night work premiums. But what about the cost to the economy of bringing an entire city to a standstill during business hours? The math doesn't add up.
What Better Planning Looks Like
It's not enough to criticize without offering solutions. So what would better-planned road construction actually look like in Kenya?
Comprehensive Impact Assessments
Before any major road project begins, authorities should conduct thorough traffic impact assessments. How many vehicles use this route daily? When are peak hours? What alternative routes exist, and can they handle diverted traffic? What is the expected economic impact of various construction approaches?
This information should inform every aspect of project planning, from scheduling to diversion routes to communication strategies.
Staged Construction Timelines
Projects should be broken into clear phases, with each phase having specific start and end dates communicated to the public. For example: "Phase 1 (Months 1-3): Work on northbound lanes, southbound lanes remain fully open. Phase 2 (Months 4-6): Work on southbound lanes, northbound lanes fully open."
This approach keeps traffic flowing and gives motorists predictability. They can plan routes and schedules accordingly.
Upgraded Diversions
Before closing a major route, alternative routes should be upgraded to handle the additional traffic. This might mean: temporarily improving road surfaces on alternative routes, adding clear signage well in advance of the diversion point, deploying traffic police to manage congestion at key junctions, and creating temporary traffic lights where needed.
The cost of these measures is minimal compared to the economic cost of gridlock.
Real-Time Communication
We live in a digital age. There's no excuse for poor communication. Authorities should provide: real-time updates on project progress via websites, apps, and SMS services, clear maps showing closed sections and recommended alternatives, advance notice of any changes to timelines or traffic patterns, and dedicated hotlines for motorists to report problems or seek information.
Several Kenyan tech startups have developed traffic apps that could easily integrate this information if authorities would provide it consistently.
Off-Peak Scheduling
The most disruptive work, such as road closures, major excavation, or lane reconfigurations, should be scheduled for nights, weekends, and public holidays when traffic volumes are lower. Yes, this may increase direct construction costs, but it dramatically reduces the broader economic impact.
Contractor Accountability
Construction contracts should include penalty clauses for contractors who fail to meet agreed timelines or who cause unnecessary disruption. Currently, there's little incentive for contractors to work efficiently or minimize public inconvenience. Their contracts are often vague on these points, and penalties are rarely enforced even when projects run months or years behind schedule.
International Examples Worth Studying
Kenya doesn't need to reinvent the wheel. Many countries have developed effective approaches to managing road construction that we could adapt to our context.
Singapore's Land Transport Authority provides real-time construction updates through multiple channels and requires contractors to maintain minimum traffic flow standards during peak hours. South Korea often conducts major road construction at night, completing projects faster and with less disruption. The United Kingdom uses extensive temporary traffic management systems, including well-maintained diversions and clear signage, during roadworks.
Even closer to home, Rwanda has implemented more structured approaches to infrastructure development, with clearer timelines and better communication, offering lessons for Kenya.
The Role of Public Accountability
Ultimately, better road construction planning requires public accountability. Kenyans have become too accepting of infrastructure chaos as "just the way things are." But infrastructure is built with public funds for public benefit. Citizens have every right to demand better planning and execution.
This means: asking questions when projects are announced without clear timelines, demanding access to traffic impact assessments and project plans, holding authorities accountable through public participation forums and social media, supporting organizations that advocate for better urban planning, and refusing to normalize the current dysfunction.
The Kenya Roads Board, KeNHA, KURA, and county governments need to understand that Kenyans expect more. Not perfection, but basic consideration for the public whose lives and livelihoods are affected by construction decisions.
Moving Forward: What Needs to Change
For Kenya to break out of this cycle of construction chaos, several things need to happen at the policy level.
First, there should be mandatory traffic management plans for all major road projects, with these plans made public and subject to review before projects begin. Second, construction contracts need to explicitly include public impact considerations, with financial penalties for contractors who cause unnecessary disruption.
Third, we need dedicated traffic management units within road authorities, staffed by people who understand traffic flow and can plan accordingly. Fourth, public participation should be built into the planning process, not as a token consultation but as a genuine opportunity for affected communities to provide input.
Finally, there should be regular audits of ongoing projects, with public reports on whether they're meeting traffic management commitments.
The Bottom Line
Road construction is necessary. Kenya's infrastructure needs investment and improvement. No one disputes this. But the way we currently approach construction, with minimal planning for traffic impact, poor communication, and little accountability, is costing the country billions of shillings and countless hours of lost productivity.
More importantly, it's diminishing quality of life for millions of Kenyans who spend hours each day navigating construction chaos that could be largely avoided with better planning.
Infrastructure should facilitate economic growth, not impede it. Roads should connect us, not trap us in gridlock. It's time we stopped accepting construction chaos as inevitable and started demanding the thoughtful, well-planned infrastructure development that Kenyans deserve.
The technology exists. The knowledge exists. International best practices are readily available. What's needed now is the political will to prioritize public welfare in infrastructure planning and the public pressure to make it happen.
Because the question isn't whether we can do better. It's why we haven't demanded it already.